390701 / MI0000181230 CARLETON FARMS LANDFILL
28800 CLARK RD, NEW BOSTON, MI 48164

QMR Reports (93)

Due Date
Date Received
1/30/2026 1/30/2026
Due Date:
1/30/2026
Date Received:
1/30/2026
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
Yes
Branch:
WA - Warren District Office
Review Notes:
- Initial SSIs: chloride at MW-23, MW-24; Total Organic Carbon at MW-09,
MW-10, MW-38, MW-39, MW-52, MW-53, MW-54, and MW-55. - Verif
ed SSIs: dissolved barium at MW-15, MW-33, and MW-38. - Alt
rnate source demonstrations acceptable. - Surface water sam
les were not collected at SW-1, SW-2, and SW-3 due to lack of flow
at the time of sampling. - Leachate analytical results simila
to historical results. - Total dissolved solids (TDS) concen
rations at MW-08, MW-09, MW-10, MW-33, MW-34, MW-38, and MW-48
reater than Part 201 aesthetic criteria. - This monitoring event w
s the first statistical evaluation for MW-06R, MW- 52, MW-54, and MW-55.
10/30/2025 10/29/2025
Due Date:
10/30/2025
Date Received:
10/29/2025
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
Yes
Branch:
WA - Warren District Office
Review Notes:
- No groundwater sampling in third quarter. - Surface water samples
were not collected at SW-1, SW-2, and SW-3 due to lack of flow
at the time of the sampling event. - Leachate analytical data s
milar to historical results. - Replacement well MW-06R unde
went its last background groundwater sampling event this quarter.
7/30/2025 7/30/2025
Due Date:
7/30/2025
Date Received:
7/30/2025
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
Yes
Branch:
WA - Warren District Office
Review Notes:
Initial SSIs: dissolved barium at MW-08, MW-13, and MW-22. - Verified
SSIs: dissolved barium at MW-15, MW-33, and MW-38. - Altern
te source demonstrations acceptable. - Surface water sample
from SW-1, SW-2, and SW-3 were not collected due to lack of flo
at time of sampling event. - Leachate analytical results similar t
historical results. - Total dissolved solids (TDS) concentra
ions at MW-08, MW-09, MW-10, MW-33, MW-34, MW-38, and MW-48 gre
ter than Part 201 aesthetic criterion. - Collection of backgroun
groundwater quality data at MW-52, MW-54, and MW-55 has been com
leted. MW-06R is still having background data being collected. -
4/30/2025 4/29/2025
Due Date:
4/30/2025
Date Received:
4/29/2025
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
No
Branch:
WA - Warren District Office
Review Notes:
- No groundwater sampling in first quarter. - Surface water samples
were collected at SW-1, SW-2, and SW-3. Surface water analyti
al results were generally consistent with historical data. - Le
chate analytical data from the primary leachate collection system i
similar to historical results. A sample from the combined ash primar
collection system discharge was not able to be sampled due to free
ing conditions at the time of sampling. - MW-6R, MW-52, MW-54
and MW-55 are in the process of having samples collected to assess s
atistical background groundwater conditions. No exceedances o
Part 201 criteria have occurred.
1/30/2025 1/30/2025
Due Date:
1/30/2025
Date Received:
1/30/2025
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
Yes
Branch:
WA - Warren District Office
Review Notes:
- Initial SSIs: total organic carbon (TOC) at MW-53; total inorganic
carbon (TIN) at MW-34; dissolved barium at MW-09 and MW-24. - Verif
ed SSIs: dissolved barium at MW-15, MW-33, and MW-38. - Alt
rnate source demonstrations acceptable. - Surface water and
leachate analytical results similar to historical results. - Tot
l dissolved solids (TDS) at MW-08, MW-09, MW-10, MW-33, MW-34, M
-38, and MW-48 greater than Part 201 aesthetic criterion. - A su
face water sample was not collected at sampling point SW-3 due to
lack of flow at time of sampling event. - MW-32 abandoned in D
cember 2024 due to cell expansion. - MW-52, MW-54, and MW-55 a
e in the process of having background collected.
10/30/2024 10/28/2024
Due Date:
10/30/2024
Date Received:
10/28/2024
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
No
Branch:
WA - Warren District Office
Review Notes:
- No groundwater sampling in third quarter. - Surface water samples
were collected at SW-2 and SW-3. A sample was not collected at S
-1 due to the lack of flow at the time of sampling. Surface water anal
tical results were generally consistent with historical data, but
SW-2 did increase slightly from recent sampling results. - Leachat
analytical data is similar to historical results. - MW-53 wa
resampled for carbon disulfide and the result was non-detect.
7/30/2024 7/30/2024
Due Date:
7/30/2024
Date Received:
7/30/2024
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
Yes
Branch:
WA - Warren District Office
Review Notes:
- Initial SSIs: dissolved arsenic at MW-33; dissolved barium at MW-22;
chloride at MW-23 and MW-24; total organic carbon (TOC) at MW-35.
- Verified SSIs: dissolved barium at MW-15, MW-33, and MW-38. - Alt
rnate source demonstrations acceptable. - Surface water and
leachate data similar to historical results. - Total dissolved
olids (TDS) at MW-08, MW-09, MW-10, MW-33, MW-34, MW-38, and M
-48 above Part 201 GRCC. - Carbon disulfide was detected at
W-53 at 1.4 ug/L. A resample will be collected during third quarter 2024.
4/30/2024 4/30/2024
Due Date:
4/30/2024
Date Received:
4/30/2024
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
No
Branch:
WA - Warren District Office
Review Notes:
- No groundwater sampling in first quarter. - Surface water analytical
data is similar to historical results - Leachate analytical d
ta is similar to historical results.
1/30/2024 1/30/2024
Due Date:
1/30/2024
Date Received:
1/30/2024
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
Yes
Branch:
WA - Warren District Office
Review Notes:
- SSIs: Dissolved Barium at MW-15, MW-33, MW-38; Total inorganic nitrogen
(TIN) at MW-51; Total organic carbon (TOC) at MW-9. - Altern
te Source Demonstrations acceptable. - Surface water and le
chate data similar to historical results. - Total dissolved sol
ds (TDS) at MW-08, MW-09, MW-10, MW-33, MW-34, MW-38, MW-48 > Pa
t 201 GRCC.
10/30/2023 10/31/2023
Due Date:
10/30/2023
Date Received:
10/31/2023
Responsible Person:
Darling, Aaron
Statistical Exceedence?:
No
Branch:
WA - Warren District Office
Review Notes:
- No groundwater sampling in 3rd quarter. - Surface water sampling
was not conducted at sampling locations SW-1 and SW-2 due to l
ck of flow at the time of sampling. - Surface water analytica
data at SW-3 is similar to historical results. - Leachate analyt
cal data is similar to historical results.
New Row
Due Date:
Date Received:
Responsible Person:
Statistical Exceedence?:
Branch:
Review Notes: