395326 / MID030179782 BILLERUD ESCANABA TYPE III LANDFILL
7100 COUNTY 426 M.5 RD, ESCANABA, MI 49829

QMR Reports (91)

Due Date
Date Received
8/1/2024 8/1/2024
Due Date:
8/1/2024
Date Received:
8/1/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 2 1st semiannual GMR received and reviewed. Intra-well control
limit exceedances: alkalinity at BW3R, PW17A; COD at BW3R, PW13; mangan
se at BW3R; and TOC at BW3R, PW1R. Mn exceeded Part 201 standa
ds at BW-3R. Inter-well statistically significant concentrati
ns above site background: COD at PW13 and PW1R and TOC at PW1R. Rep
rt accepted letter sent.
7/31/2024 7/24/2024
Due Date:
7/31/2024
Date Received:
7/24/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 1 Landfill: First semiannual 2024 GMR. Exceedance above the calculated
intra-well control limits and Part 201 Residential Drinking Wa
er Criteria for iron in PW-5
7/30/2024 7/24/2024
Due Date:
7/30/2024
Date Received:
7/24/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 3-7: 1st semi-annual 2024 GMR received and reviewed: constituents
exceeded the calculated intra-well control limit: • bicarbon
te alkalinity in PW35, PW36, PW34A, • boron in PW34A, PW34,
W36, cadmium in PW28AR , • iron in PW32, PW33, PW34A, PW34 (a
so above Part 201 Standards) • manganese in PW33, PW34, PW36
(also above Part 201 Standards). Inter-well (upgradient vs. downgra
ient) exceeded prediction limit: • bicarbonate alkalinity PW34
, PW35, PW36, • iron PW32, W33, PW34, PW34A , • manganese PW33
7/30/2024 7/24/2024
Due Date:
7/30/2024
Date Received:
7/24/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 2 1st semi-annual 2024 QMR: intra-well control limit exceedances:
alkalinity at BW3R, PW17A; COD at BW3R, PW13; manganese at BW3R;
nd TOC at BW3R, PW1R. Manganese was above Part 201 standards at
W-3R. Inter-well statistical evaluations indicated that the following con
tituents were present at statistically significant concentration
above site background: COD at PW13 and PW1R and TOC at PW1R
7/30/2024 7/24/2024
Due Date:
7/30/2024
Date Received:
7/24/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
No
Branch:
MA - Marquette District Office
Review Notes:
1st semi-annual 2024 QMR for RAP no exceedances of the applicable GSI
criteria and indicate that the quality of the groundwater vent
ng to the Escanaba River is protective of surface water conditions.
1/30/2024 1/19/2024
Due Date:
1/30/2024
Date Received:
1/19/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 2 second semi-annual 2023 GMR received and reviewed: barium,
boron, TOC, manganese, COD and bicarbonate alkalinity in monitor
ng well BW3R and bicarbonate alkalinity in PW17A exceedances of int
awell statistics. In addition, manganese is above applicable Part 201
tandards in BW3R. BW3R is upgradient and represents background conditions.
1/30/2024 1/19/2024
Due Date:
1/30/2024
Date Received:
1/19/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase I second semi-annual 2023 GMR received and reviewed. barium in
PW26A, PW5, iron in PW 5 and CODin WW14 and iron was above the P
rt 201 Residential Drinking Water Criteria in PW5.Phase I is unmonito
able.
1/30/2024 1/19/2024
Due Date:
1/30/2024
Date Received:
1/19/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
No
Branch:
MA - Marquette District Office
Review Notes:
Phase I semi-annual monitoring report received. No exceedances.
7/31/2023 7/27/2023
Due Date:
7/31/2023
Date Received:
7/27/2023
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
No
Branch:
MA - Marquette District Office
Review Notes:
RAP 1st semi-annual 2023 GMR no exceedances of the applicable GSI criteria.
Report accepted, letter sent.
7/31/2023 7/27/2023
Due Date:
7/31/2023
Date Received:
7/27/2023
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase I Landfill 1st semi-annual 2023 GMR report reviewed: concentrations
above the calculated intra-well control limits in the following monitor
ng wells: bicarbonate in PW4A, PW26A, WW14; iron in PW5; TOC i
WW14 and PW5; and pH in PW26, PW30, PW4, PW5 and WW15. Additiona
ly, iron was above the Part 201 Residential Drinking Water Crit
ria in PW5. No confirmation sampling or demonstration will be per
ormed as Phase 1 is unmonitorable.
New Row
Due Date:
Date Received:
Responsible Person:
Statistical Exceedence?:
Branch:
Review Notes: