Advanced Search
Modules
Dashboard
Site ID
Solid Waste Management
Utilization
Scrap Tire Management
Compliance, Monitoring & Enforcement
Hazardous/Liquid Industrial Waste Management
User Charges
Recent Sites
395326 / MID030179782 BILLERUD ESCANABA LLC
Applications
Construction Permits
Operating Licenses
Financial Assurance
Disposal Areas
Annual Landfill Reports
QMR Reports
Non-Captive Surcharges
Captive Surcharges
Remedial Action Plans
Contacts
TENORM
395326 / MID030179782 BILLERUD ESCANABA TYPE III LANDFILL
7100 COUNTY 426 M.5 RD, ESCANABA, MI 49829
Save
Cancel
QMR Reports (
91
)
Jump to:
Go
<<
<
1 of 10
>
>>
Due Date
Date Received
8/1/2024
8/1/2024
Due Date:
8/1/2024
Date Received:
8/1/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 2 1st semiannual GMR received and reviewed. Intra-well control limit exceedances: alkalinity at BW3R, PW17A; COD at BW3R, PW13; manganese at BW3R; and TOC at BW3R, PW1R. Mn exceeded Part 201 standards at BW-3R. Inter-well statistically significant concentrations above site background: COD at PW13 and PW1R and TOC at PW1R. Report accepted letter sent.
Phase 2 1st semiannual GMR received and reviewed. Intra-well control
limit exceedances: alkalinity at BW3R, PW17A; COD at BW3R, PW13; mangan
se at BW3R; and TOC at BW3R, PW1R. Mn exceeded Part 201 standa
ds at BW-3R. Inter-well statistically significant concentrati
ns above site background: COD at PW13 and PW1R and TOC at PW1R. Rep
rt accepted letter sent.
7/31/2024
7/24/2024
Due Date:
7/31/2024
Date Received:
7/24/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 1 Landfill: First semiannual 2024 GMR. Exceedance above the calculated intra-well control limits and Part 201 Residential Drinking Water Criteria for iron in PW-5
Phase 1 Landfill: First semiannual 2024 GMR. Exceedance above the calculated
intra-well control limits and Part 201 Residential Drinking Wa
er Criteria for iron in PW-5
7/30/2024
7/24/2024
Due Date:
7/30/2024
Date Received:
7/24/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 3-7: 1st semi-annual 2024 GMR received and reviewed: constituents exceeded the calculated intra-well control limit: • bicarbonate alkalinity in PW35, PW36, PW34A, • boron in PW34A, PW34, PW36, cadmium in PW28AR , • iron in PW32, PW33, PW34A, PW34 (also above Part 201 Standards) • manganese in PW33, PW34, PW36 (also above Part 201 Standards). Inter-well (upgradient vs. downgradient) exceeded prediction limit: • bicarbonate alkalinity PW34A, PW35, PW36, • iron PW32, W33, PW34, PW34A , • manganese PW33
Phase 3-7: 1st semi-annual 2024 GMR received and reviewed: constituents
exceeded the calculated intra-well control limit: • bicarbon
te alkalinity in PW35, PW36, PW34A, • boron in PW34A, PW34,
W36, cadmium in PW28AR , • iron in PW32, PW33, PW34A, PW34 (a
so above Part 201 Standards) • manganese in PW33, PW34, PW36
(also above Part 201 Standards). Inter-well (upgradient vs. downgra
ient) exceeded prediction limit: • bicarbonate alkalinity PW34
, PW35, PW36, • iron PW32, W33, PW34, PW34A , • manganese PW33
7/30/2024
7/24/2024
Due Date:
7/30/2024
Date Received:
7/24/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 2 1st semi-annual 2024 QMR: intra-well control limit exceedances: alkalinity at BW3R, PW17A; COD at BW3R, PW13; manganese at BW3R; and TOC at BW3R, PW1R. Manganese was above Part 201 standards at BW-3R. Inter-well statistical evaluations indicated that the following constituents were present at statistically significant concentrations above site background: COD at PW13 and PW1R and TOC at PW1R
Phase 2 1st semi-annual 2024 QMR: intra-well control limit exceedances:
alkalinity at BW3R, PW17A; COD at BW3R, PW13; manganese at BW3R;
nd TOC at BW3R, PW1R. Manganese was above Part 201 standards at
W-3R. Inter-well statistical evaluations indicated that the following con
tituents were present at statistically significant concentration
above site background: COD at PW13 and PW1R and TOC at PW1R
7/30/2024
7/24/2024
Due Date:
7/30/2024
Date Received:
7/24/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
No
Branch:
MA - Marquette District Office
Review Notes:
1st semi-annual 2024 QMR for RAP no exceedances of the applicable GSI criteria and indicate that the quality of the groundwater venting to the Escanaba River is protective of surface water conditions.
1st semi-annual 2024 QMR for RAP no exceedances of the applicable GSI
criteria and indicate that the quality of the groundwater vent
ng to the Escanaba River is protective of surface water conditions.
1/30/2024
1/19/2024
Due Date:
1/30/2024
Date Received:
1/19/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase 2 second semi-annual 2023 GMR received and reviewed: barium, boron, TOC, manganese, COD and bicarbonate alkalinity in monitoring well BW3R and bicarbonate alkalinity in PW17A exceedances of intrawell statistics. In addition, manganese is above applicable Part 201 standards in BW3R. BW3R is upgradient and represents background conditions.
Phase 2 second semi-annual 2023 GMR received and reviewed: barium,
boron, TOC, manganese, COD and bicarbonate alkalinity in monitor
ng well BW3R and bicarbonate alkalinity in PW17A exceedances of int
awell statistics. In addition, manganese is above applicable Part 201
tandards in BW3R. BW3R is upgradient and represents background conditions.
1/30/2024
1/19/2024
Due Date:
1/30/2024
Date Received:
1/19/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase I second semi-annual 2023 GMR received and reviewed. barium in PW26A, PW5, iron in PW 5 and CODin WW14 and iron was above the Part 201 Residential Drinking Water Criteria in PW5.Phase I is unmonitorable.
Phase I second semi-annual 2023 GMR received and reviewed. barium in
PW26A, PW5, iron in PW 5 and CODin WW14 and iron was above the P
rt 201 Residential Drinking Water Criteria in PW5.Phase I is unmonito
able.
1/30/2024
1/19/2024
Due Date:
1/30/2024
Date Received:
1/19/2024
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
No
Branch:
MA - Marquette District Office
Review Notes:
Phase I semi-annual monitoring report received. No exceedances.
Phase I semi-annual monitoring report received. No exceedances.
7/31/2023
7/27/2023
Due Date:
7/31/2023
Date Received:
7/27/2023
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
No
Branch:
MA - Marquette District Office
Review Notes:
RAP 1st semi-annual 2023 GMR no exceedances of the applicable GSI criteria. Report accepted, letter sent.
RAP 1st semi-annual 2023 GMR no exceedances of the applicable GSI criteria.
Report accepted, letter sent.
7/31/2023
7/27/2023
Due Date:
7/31/2023
Date Received:
7/27/2023
Responsible Person:
St Antoine, Mary Ann
Statistical Exceedence?:
Yes
No
Yes
Branch:
MA - Marquette District Office
Review Notes:
Phase I Landfill 1st semi-annual 2023 GMR report reviewed: concentrations above the calculated intra-well control limits in the following monitoring wells: bicarbonate in PW4A, PW26A, WW14; iron in PW5; TOC in WW14 and PW5; and pH in PW26, PW30, PW4, PW5 and WW15. Additionally, iron was above the Part 201 Residential Drinking Water Criteria in PW5. No confirmation sampling or demonstration will be performed as Phase 1 is unmonitorable.
Phase I Landfill 1st semi-annual 2023 GMR report reviewed: concentrations
above the calculated intra-well control limits in the following monitor
ng wells: bicarbonate in PW4A, PW26A, WW14; iron in PW5; TOC i
WW14 and PW5; and pH in PW26, PW30, PW4, PW5 and WW15. Additiona
ly, iron was above the Part 201 Residential Drinking Water Crit
ria in PW5. No confirmation sampling or demonstration will be per
ormed as Phase 1 is unmonitorable.
New Row
Due Date:
Date Received:
Responsible Person:
Statistical Exceedence?:
Yes
No
Branch:
Review Notes:
Save
Cancel
Filter:
Row(s) Selected :
0
Cancel
Done
Loading...
Cancel
Done
Filter:
Row(s) Selected :
0
Cancel
Done
Loading...
Cancel
Done
Ok
Yes
No
Reporting Period*
Responsible Person*
Branch*
Q1 - Quarter 1
Q2 - Quarter 2
Q3 - Quarter 3
Q4 - Quarter 4
Q1 - Quarter 1
Q2 - Quarter 2
Q3 - Quarter 3
Q4 - Quarter 4
Generate QMR Requirements
Cancel
OK
Loading...
Close
Close
Michigan.gov Home
|
EGLE_Home
|
Online Services
|
Permits
|
Programs
|
Site Map
|
Contact_DEQ
State Web Sites
|
Privacy Policy
|
Link Policy
|
Accessibility Policy
|
Security Policy
|
Michigan News
Copyright © 2001-2021 State of Michigan
Version 1.2.0.4135-W